What is the process of boiler blow down?

Prepare for the CFESA Steam Test. Access flashcards and multiple choice questions with hints and explanations. Master the essentials for your certification!

Boiler blow down is an essential maintenance process used in steam boiler systems to manage the concentration of dissolved solids and impurities in the water. When water is heated in a boiler, various minerals and contaminants can accumulate, leading to increased water hardness, scale build-up, and operational inefficiencies.

By draining some of the water from the boiler under pressure, as is done during blow down, the concentration of these impurities is reduced. This practice helps maintain water quality, prevent corrosion, and ensure the safe and efficient operation of the boiler. The blow down process typically involves the controlled release of water, and it is important to do so while the system maintains proper operating conditions.

Filling the boiler with more water, insulating the boiler, or increasing the pressure does not address the issue of impurities in the water and does not directly contribute to the maintenance of boiler water quality. Therefore, draining the boiler under pressure is the correct definition of boiler blow down.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy